Crystal Palace™
1. Apply GTMOST technology and concrete design1. Applicable for the advanced pressurized or submerged
membrane treatment system, and MBR wastewater treatment system. The system could be on the ground,
underground or semi-underground.
2. Concrete-made membrane tank is applied thus the construction investment is reduced, and project size is
enlarged. The transparent design is convenient for maintenance and management.
3. Specifically applicable for the municipal wastewater treatment projects.
4. The most fantastic UF workshop.